Retail Fit Out – Exchange Shopping Centre, Ilford, London

The Exchange Shopping Centre, Ilford

CLIENT:Capital & Regional

SECTOR: Commercial /Retail

LOCATION: The Exchange Ilford – Bodycare Unit

START DATE:  16th September 2024

COMPLETION DATE:  20th December 2024

DURATION:  14 Weeks

Project Details

Client Brief:

Our client, Capital & Regional, had two single retail units that were occupied by tenants on short term leases. In order to facilitate a large retailer coming into the shopping centre on a new long-term lease, they needed a large double width unit with a partial retail fit out completed by the time the new retailer took occupation.

As a busy shopping centre all works completed in the retail unit had to comply with their safety requirements and cause minimal disruption to existing retailers and customers visiting the shopping centre facilities.

Retail unit fit-out in London

Project Description

The first task at the Exchange shopping centre was for the two existing retail units to be fully stripped out of all fixtures, fittings and all of the previous tenant’s installations including M&E services and shopfronts.

Once the interior was cleared, the dividing block wall between the two units was then demolished to convert the unit into one large double width retail unit.

Prior to the retail fit-out works commencing, there were several issues that had to be resolved to comply with the fire regulations. This meant that we had to install fire curtains at certain intervals and a new firebreak on the shopfront line. We were also required to coat any exposed structural steel with intumescent paint so a 60 mins rating was achieved.

Our partial fit-out of the retail unit required us to install a glazed shopfront and automated entrance shutters. The internal fit-out included a new lay-in grid ceiling was installation with integrated LED lighting panels (including emergency fittings), sprinkler heads and smoke detectors.

All interior walls on the shop floor were lined with plasterboard, and small power supplies were installed along this for future connections by the incoming retailer.

Off the shop floor, in the back of house area we provided an accessible WC and office for staff use.

A tempered air supply and extractor system was installed, which was routed up to new plant on the main roof through existing, congested risers.

Following the completion of the incoming tenant’s fit-out, we returned out of hours to remove the shopfront hoarding and replaced the glazed smoke downstand on the main mall.

Fit-Out Services provided

  • Demolition
  • Glazed Shopfronts & Entrance Shutters

  • Lighting & Small Power

  • Plasterboard Linings

  • Screeding

  • New Ceilings

  • Tempered air supply and extract

  • Fire Alarm alterations

  • Sprinklers

  • Fire Stopping
  • Decorations

Project Gallery

Need help with your retail fit out project?

As established, reputable retail fit out contractors Metropolis Projects have extensive expertise and experience working with retail sector clients on construction, fit-out, modernisation and refurbishment projects in shopping centres and retail units. We have worked as a principle contractor for various shopping centre owners and retail clients to deliver all kinds of large and small fit out projects.

Rest assured, if you are a commercial property owner, a retailer looking to go into a new premises, or have a retail fit out project that you need managed and completed by a capable construction partner, you have found your primary contractor to deal with it all for you.

Contact us today to discuss your requirements.

Call us on: 020 8204 5745

Send us an email